Who this checklist is for

This is for buyers sourcing wholesale prescription glasses for a retail chain, a distribution channel, or an online storefront — the kind of buyer who opens the invoice file, not just the dashboard. If you're testing custom prescription glasses online as a new SKU, or adding custom clip-on sunglasses for prescription glasses to a catalog that already sells frames, the same nine steps apply.

I'm a procurement manager at a 40-person optical retail company. I've managed our frame and lens budget — roughly $180,000 a year — for six years, negotiated with 30-plus vendors, and logged every order in our cost tracking system. What follows is the checklist I actually run, in the order I run it. Nine steps, from pre-RFQ to first delivery.

Step 1 — Build your TCO baseline before anyone quotes you

Unit price is the least useful number in eyewear sourcing. What you need is landed cost per pair, and you need it defined before quotes come in — otherwise you'll end up comparing a bare unit price against a bundled one and calling it a comparison.

My baseline template has six lines: unit price, tooling/setup, coating and treatment add-ons, freight plus duty, expected remake rate × remake cost, and inventory holding cost for slow-moving SKUs. That last one is where wholesale eyewear gets people. A cheap SKU that sits for nine months isn't cheap.

When I audited our 2023 spending across 14 vendors, the quoted unit price predicted final landed cost in only about half the cases. The other half moved by 9–31% once tooling and freight were loaded in. That's not a rounding error. That's your margin.

Step 2 — Lock the specification before the RFQ, not after

Every sourcing problem I've had in this category, without exception, traces back to a specification that was loose when the quote was signed. So write the spec down and make it boring:

  • Sphere range and cylinder range, with the axis increments you'll actually stock
  • Lens material (CR-39, polycarbonate, 1.67 high-index) and any minimum center thickness
  • Coating stack — anti-reflective, hard coat, hydrophobic, blue-light filter if relevant — by layer, not by marketing name
  • Frame material and hinge type, since hinge failure is your top warranty claim
  • Optical tolerance standard, named explicitly

On that last one: in the US, prescription eyewear is regulated as a Class I medical device, and the optical tolerance benchmark most labs test against is ANSI Z80.1. I am not a compliance officer, and you should verify the current revision with your supplier — but naming a standard in the RFQ changes the conversation. Vendors who can't tell you which revision they test to are telling you something.

Step 3 — Ask the hidden-fee questions out loud

Here's the thing about wholesale eyewear quotes: the setup line is where the real negotiation lives, and nobody volunteers it. Ask directly, in writing, before the quote is issued:

  1. Tooling or mold fee for custom frames — one-time or per-run?
  2. Lens surfacing setup for custom prescriptions — is there a minimum batch?
  3. Coating run charge, and does it change with the number of SKUs per order?
  4. Clip-on hardware tooling — separate from the frame tooling, almost always
  5. Pick-and-pack fee if the order ships as multiple cartons
  6. Custom laser marking or logo placement on the temple

I once took a 'free setup' offer at face value. It cost us $1,850 more across the year, because the setup was free but the per-unit masking charge wasn't, and it appeared on every invoice at a volume I hadn't modeled. That's the pattern — the fee doesn't disappear, it relocates.

Step 4 — Sample custom orders in physical form. Always.

Renders lie and sample photos lie more. For custom prescription glasses, ask for a physical sample at your actual specification — your material, your coating, your hinge. For custom clip-on sunglasses for prescription glasses, this step matters double, because the entire value of a clip-on is the fit: does the clip engage the frame bridge without scratching it, does the lens sit flat, is the tint match consistent across the batch.

I went back and forth between a supplier with a beautiful sample kit and one with ugly packaging and a plain-looking sample for two weeks. The beautiful kit supplier's sample was a different frame than the one quoted — same style number, different hinge. The plain supplier's sample matched. I chose the plain one. Cost me 6% more per unit. Worth every cent.

Step 5 — Audit the lens tolerance and inspection protocol (most buyers skip this)

This is the step I'd put in bold if I could. Ask the supplier to describe, in writing, how they verify:

  • Sphere and cylinder power accuracy, and at what sampling rate
  • Axis alignment for astigmatic prescriptions
  • Optical center and prism measurement for decentered lenses
  • Coating adhesion and abrasion resistance testing

Then ask for the last inspection record from a comparable order, with customer names redacted. A supplier who can produce that in 48 hours is a supplier who inspects. A supplier who sends you a brochure is a supplier who hopes.

I don't have hard data on industry-wide defect rates — I've never seen a credible cross-vendor benchmark and I'm not going to invent one. Based on our own order history, my sense is that quality issues affect somewhere around 8–12% of first deliveries, and the majority of those are coating-related rather than power-related, which is exactly why the coating adhesion question matters more than buyers think.

Step 6 — Put the remake terms in the contract, not the sales call

Get three things written down: the remake window (days from delivery, not from order), who pays freight on remakes, and what counts as a valid claim. Vague warranty language is a cost center. I've seen 'quality guaranteed' mean nothing at all when the disagreement was over whether a 0.25D deviation was out of tolerance.

If your spec in Step 2 names a tolerance standard, this step writes itself. That's the payoff for doing Step 2 properly.

Step 7 — Let turnover and breakage set your order quantity, not the discount tier

Volume discounts are seductive and frequently wrong. Before you chase a tier, model two numbers: sell-through rate per SKU per month, and your historical breakage/return rate. Then size the order against the slower of the two.

If I could redo one decision from 2022, I'd halve our first order on a new custom frame line. We hit the discount tier, saved about 11% on unit price, and then carried nine months of dead stock on two SKUs. The savings were real. So was the carrying cost, and the carrying cost won.

Step 8 — Compare landed cost, not FOB price

Now run every quote through the Step 1 template. Freight, duty, insurance, port or clearance fees, the per-carton pick fee, and the modeled remake cost. Put the final number in one column and sort it.

The reordering is usually dramatic. In a 600-pair comparison I ran in Q2 2024, the lowest FOB quote ranked fourth on landed cost. The gap between first and fourth was 14% — entirely inside freight terms and remake exposure. Fourteen percent is the difference between a viable private label and an expensive hobby.

Step 9 — Keep a live comparison sheet for every vendor you've ever quoted

Not a folder of PDFs. One sheet, one row per quote, with columns for date, spec version, unit price, all fee lines, freight basis, lead time, remake terms, and the landed-cost result. Update it every time a quote comes in, even for vendors you don't use.

Two reasons. First, it kills the renewal conversation — you walk in with 18 months of their own pricing history. Second, it tells you when a vendor's pricing has drifted in a way that a single quote never would.

Things that go wrong, and how to catch them early

  • Spec drift between quote and production. Catch it by attaching the spec sheet to the purchase order as an exhibit, with a version number. If it isn't attached, it isn't agreed.
  • Coating names that mean different things to different vendors. Ask for the layer stack, not the product name. 'Premium AR' is marketing; 'hydrophobic top coat over 5-layer AR' is a specification.
  • Clip-on hardware quoted as an afterthought. Tooling for a clip mechanism is separate from frame tooling and often quoted late. Ask in Step 3, confirm in the sample in Step 4.
  • Assuming the supplier's 'standard' matches yours. It usually doesn't. Name the standard in writing.
  • Treating the cheapest quote as the starting point for negotiation. It's a data point, not a baseline. Baseline lives in your TCO sheet.

Prices and freight terms in this category move constantly, and standards get revised. Everything above reflects our process and pricing as of early 2025 — verify current rates and the current revision of any tolerance standard with your supplier before you sign anything.